Our Projects
Proven capability. Practical results.
From major Pilbara infrastructure to local quarry supply, Yule Works has supported projects across Western Australia for more than two decades. Each job showcases our experience, adaptability, and commitment to getting it done right the first time.
Gorgon Project – Barrow Island
-
Chevron / Holcim
-
Produce, sort, and load out 1.8 million tonnes of armour rock into stockpiles for marine works.
Work included 24-hour production scheduling, stockpile management, and loading materials using newly adopted weighing-system technology.
-
Delivered safely, efficiently, and to a high technical standard.
Strong performance led to ongoing work opportunities with the client.
-
1.8 million tonnes of armour rock
Delivered over 3 years
Continuous operations for 18 months, 24 hours a day
Featured in industry articles due to innovative weighing technology and production performance
0 LTIs
Roy Hill – Bridge Abutment Construction Works
-
MCS (Mobile Concreting Solutions)
-
Sort, produce, and stockpile armour rock in multiple size classes.
Cart and place material on bridge abutments where the Roy Hill train crosses a river.
Excavation of footing areas prior to rock placement.
-
Successfully completed within a 6-month program, safely and to specification.
Provided full crushing, sorting, transport, and placement services.
-
4–5 excavators operating concurrently
Multiple armour rock size classes produced and placed
Combined crushing, sorting, haulage and construction works delivered
0 LTIs
Spoilbank Marina – Port Hedland
-
Holcim (working under Pilbara Ports Authority infrastructure scope)
-
Sort, manage, and load out 120,000 tonnes of armour rock in multiple grades, including pieces up to 10 tonnes.
Work required specialised cutting methods and different machinery setups for varied rock sizes.
-
Delivered safely, efficiently, and with high consistency across all size categories.
Maintained strong production under variable rock conditions.
-
120,000 tonnes of armour rock
Multiple large-size categories up to 10t per piece
Complex sorting and loading methods utilised
0 LTIs
Mineral Resources – Yadjinup Stemming Contract
-
Mineral Resources (MRL)
-
Produce stemming material, create stockpiles, load, haul and deliver directly to Yadjinup mine site using Yule Works’ own road trains.
Full supply & delivery contract, including production, QA, logistics and on-site offloading.
-
Consistently delivered high-quality stemming material over an extended period with no interruptions and no safety incidents.
-
10,000 tonnes of stemming delivered over the past 18 months
Self-performed production, sorting, loading, and delivery
Road-train fleet used for all haulage
0 LTIs